Skip to content

English practice

Reading: Multiple Choice, Multiple Answers · Question 280

Visibility of prevented failures

PTE · Reading · hard

Read the text and answer the question by selecting all the correct responses. More than one response is correct.

Maintenance is often most visible when it fails. A broken pump or closed walkway creates an event that can be counted and discussed, while routine work that prevents such disruption leaves no comparable incident. This asymmetry can distort evaluation if managers consider only conspicuous repairs when judging the value of a maintenance team. The difficulty is not solved by claiming that every uneventful day proves the team prevented a breakdown. Equipment may have continued operating without intervention, and some scheduled work may have little effect. The absence of failure is compatible with several explanations. A sound assessment therefore needs records of condition, work performed, and the reasons for intervention, as well as information about disruptions. The argument is about matching evidence to the activity being assessed. Preventive work aims partly to alter what does not happen, so an event count alone provides an incomplete picture. At the same time, this does not exempt prevention from scrutiny. It makes the quality of the supporting comparison more important. If the evaluation rewards only dramatic recoveries, it may encourage attention to visible emergencies at the expense of less noticeable preparation. A better account can recognise that incentive problem without treating all maintenance expenditure as justified. It asks whether particular actions addressed plausible risks and whether the available evidence supports their claimed contribution.

Which inferences are warranted?

  • Every day without a breakdown demonstrates an effective intervention.
  • Recognising prevention's low visibility does not make all maintenance spending justified.
  • Rewarding only emergency recovery can create an incentive against less visible preparation.
  • A dramatic repair necessarily contributes less value than a routine inspection.
  • Preventive work cannot be evaluated because it concerns events that did not occur.
  • An incident count alone may undervalue preventive maintenance.