Skip to content

English practice

Fill in the Blanks (Dropdown) · Question 579

Thermal stress management

PTE · Reading · hard

There are some words missing in the following text. Select the most appropriate option for each blank.

Unlike traditional jointed track, continuous welded rail minimizes mechanical impact between train wheels and rail joints, dramatically reducing maintenance expenditures and vibration. However, eliminating expansion gaps creates severe engineering challenges related to thermal ____. In extreme heat, unrestrained steel expands longitudinally, generating compressive forces that can ____ catastrophic track buckling. Conversely, cold temperatures induce tensile stresses capable of fracturing brittle rail sections. To mitigate these risks, railway engineers execute a procedure known as rail stressing before final anchoring. Hydraulic tensioners pull the unfastened steel until it ____ the elongation expected at a designated stress-free neutral temperature. Once the targeted strain is achieved, the rail is clamped rigidly onto concrete sleepers embedded in deep crushed-stone ballast. The lateral resistance provided by the heavy ballast bed subsequently prevents the constrained steel from ____ sideways under high seasonal temperature gradients.